Monday started out with activity inside and ended with all the doors and most of the interior finished. There are still 1 1/2 days of mechanical assembly then it goes to the Belmont MS paint building for another five days. Here are a few photos from day 3.
There are 4 slide outs. This is the bedroom right side. |
Slide getting close |
One slide is in place |
Bathroom slide is larger. Two others up front are much larger. |
Exterior doors are next and there are about a dozen doors. |
Front driver side slide is in with large sofa bed. |
Here it is before the doors were installed. |
Going back in the plant for the next 6 work stations. It's just a big gray box but the paint work next week at Belmont will look much better. |